In addition to design plans (site plans, architectural designs, landscape designs) we will be lodging the following reports in support of the proposal (some reports are additional to those required by the SEARs conditions):

  • Statement of Environmental Effects (SEE)
  • Architectural Design Report
  • Community Engagement Report
  • Conservation Management Plan (CMP)

And other reports (in alphabetical order):

  • Aboriginal Cultural Heritage Assess. (ACHA)
  • Acoustic Assessment
  • Arboricultural Impact Assessment
  • Archaeological Assessment
  • Building Code Compliance (BCA/NCC & Accessibility)
  • Bushfire Assessment
  • Connecting with Country
  • Construction Traffic Management Plan
  • Contamination (Remediation Action Plan)
  • CPTED (Crime Prevention through Environmental Design)
  • Ecological – Biodiversity Development Assessment Report (or BDAR waiver)
  • Flood Modelling
  • Green Travel Plan
  • Ground & Surface Water Impact Assessment
  • Hazardous Materials Survey
  • Preliminary Risk Screening (Preliminary Hazards Analysis)
  • River Study (Geomorphology)
  • Services Infrastructure Report
  • Sewer & Water Modelling
  • Social Impact Assessment
  • Statement of Heritage Impact
  • Sustainability (ESD Report)
  • Traffic, Transport & Accessibility
  • Visual Impact Assessment
  • Waste Management Plan
  • Water Management Plan (stormwater management)
  • Wind Impact Assessment